Construction of the largest home for engineering in any UK university has been completed. With the conclusion of the base build phase, the Manchester Engineering Campus Development (MECD) was handed over to the University of Manchester on Friday, 14 May

Delivered by a collaborative team of builders, architects and engineers, MECD represents the single largest construction project ever completed by a higher education institution in the UK. Building design was undertaken by Mecanoo with support from Penoyre & Prasad, with detailed design during the technical and construction stages by BDP, and multidisciplinary engineering services provided by Arup. The main contractor was Balfour Beatty and it was project managed by Buro Four, with Buro Happold as the Environmental Sustainability Advisor.

MECD will provide world-class sustainable research facilities, alongside flexible and innovative teaching and learning spaces that will enable students to shape their own learning environment. It will house a community of 8,000 students, researchers, academics and professional services staff. This will be the largest concentration of interdisciplinary engineering expertise in any UK university.

The development incorporates a number of existing and new buildings: the eight-storey 80,000sqm Engineering Building A; Engineering Building B and the James Chadwick Building (on Upper Brook Street); refurbished Grade II listed Oddfellows Hall; and the York Street Building. MECD is home to purpose-designed blended lecture theatres, teaching laboratories, student workshops and a range of spaces to support our ambitious outreach and social engagement initiatives.

Director of Estates at The University of Manchester, Diana Hampson, said: “This is a hugely significant milestone for MECD and we are delighted that the initial construction phase is now complete. MECD will create facilities that will put the University at the forefront of engineering globally, and we are proud to provide such an exceptional space for our exceptional people. We’d also like to thank all the various partners and stakeholders in getting us this point, it really has been a hugely collaborative effort.”

LEAVE A REPLY

Please enter your comment!
Please enter your name here